08 6243 0379 Mon-Fri 9-5 AWST
Book a Briefing

Sectors we serve

Visa support for infrastructure and construction employers

Resource Visa helps employers bring overseas specialists onto Australian infrastructure and construction work that supports resources projects: ports, rail, power and process plant. That means short-term mobilisation for heavy lift, module installation and commissioning, and sponsorship where a role is ongoing.

Every engagement starts with an employer. We don’t take on individuals seeking a visa on their own. If you need help with your own visa, you can search the Register of Migration Agents at mara.gov.au.

Coded welder making a weld on a pipe flange in a fabrication workshop

The right visa

Which visa fits

The subclass 400 (Temporary Work (Short Stay Specialist)) visa is for short-term, highly specialised work in Australia where the skills aren’t readily available locally.

Normally up to three months in any 12-month period, counting every 400 stay with any employer. Up to six months only in exceptional circumstances, on strong evidence. A specialist who has already spent time in Australia on a 400 in the last 12 months may be granted only the balance, so offshore and FIFO rosters that add up to more than three months a year need a different visa.

If the role turns out to be ongoing, the 482 is a fresh application with its own sponsorship and nomination. A 400 may carry a ‘No Further Stay’ condition. If it does, the specialist can’t apply for the 482 while in Australia unless the Department first waives the condition. A waiver is discretionary, so the 482 may need to be lodged from outside Australia.

Not sure which visa fits? Read Short Stay Specialist visa (subclass 400) vs Skills in Demand visa (subclass 482) first.

Electrical engineer checking a switchboard against a clipboard

Sector detail

What’s specific to infrastructure and construction

Program-driven dates that move, and licensing.

A visa lets someone work in Australia; it doesn’t license the work. In Western Australia, high risk work licences, including crane, dogging and rigging classes, are issued by the Department of Local Government, Industry Regulation and Safety. Licences are recognised across Australia, but overseas tickets don’t transfer: the worker needs an Australian assessment through a registered training organisation. Dogging and rigging are licence classes in their own right, so having a local crane operator doesn’t always settle the licensing question.

Project-tied roles need care on any permanent-residence pathway. The 482 is a temporary visa. Permanent residence is a separate step, usually through the subclass 186 Temporary Residence Transition stream after a qualifying period working for an approved sponsor. For that stream the nomination comes from the sponsoring employer; a Direct Entry nomination doesn’t need sponsorship approval. Either way, the position must be full-time and available for at least two years.

Roles

Role guides for infrastructure and construction employers

Each page covers which visa typically applies to that role, what the application has to evidence, and what usually goes wrong.

Mobilisation events

The events that trigger a visa need

Book a 20-minute mobilisation briefing

Twenty minutes. No obligation. Direct with a Registered Migration Agent. Tell us the role, the site and the date.

Monday to Friday, 9am to 5pm AWST